環氧薄涂型地坪系列
環氧砂漿地坪系列
車道地坪系列
環氧自流平系列
防腐蝕地坪系列
防靜電地坪系列
環氧地坪彩砂系列
防滑地坪系列
耐磨地坪系列
運動地坪系列
藝術地坪系列
  無錫北田共建筑裝飾工程有限公司
聯系地址:無錫市惠山區洛社鎮洛神路2號
聯系人:肖經理
電 話:0510-60865167
手 機:13306173817
傳 真:0510-60865167
郵 箱:[email protected]

 
    請選出你認為應用最廣的無錫環氧地坪產品
無錫耐磨地坪
無錫聚氨酯地坪
無錫防靜電環氧地坪
防靜電環氧砂漿型
環氧砂漿地坪涂裝

  
 
 
 
當前位置 -> 首頁行業資訊專業環氧地坪施工團隊VS野雞地坪施工團隊的不同 發布時間:(2019/9/11)

專業環氧地坪施工團隊VS野雞地坪施工團隊的不同

 

環氧地坪漆施工過程中老生常談,但對于非專業團隊,他們往往很難形成完整的概念,也就無從在每一次施工過程中,在每一個無錫環氧地坪施工步驟中,都能很好的完成其施工質量,因此也常常帶來項目的許多不良現象,最后歸責于材料生產廠家.其實是因為經常會遇到客戶投訴的情況,他們會因為材料在施工的過程中出現了問題之后,就定性材料有問題,而其中,很多問題是新手施工或者“野雞”團隊施工不良引起的,最后把責任都歸結到材料質量上面來。

In the construction process of epoxy floor paint, there is a cliche, but for non-professional teams, it is often difficult for them to form a complete concept, and it is impossible for them to complete the construction quality well in each construction process, in each construction step, so it often brings many bad phenomena of the project, and finally blame the material. Material manufacturers. In fact, they often meet customer complaints. They will have problems with qualitative materials because of the problems in the construction process. Many of these problems are caused by the poor construction of novice construction or "pheasant" team. Finally, the responsibility is attributed to the quality of materials. 。 因施工不當引起的問題其實千奇百怪,其中最為常見的就是長時間沒辦法干燥固化的問題,簡單的說,任何廠家,不管是做高級別環氧漆的,還是做低端漆的,是絕對不允許材料有固化不了的情況的,要不然貨都賣不動了還咋生存?所以說,要避免許多不必要的損失,施工時找專業的團隊是非常重要的事情!下面我們不說野雞團隊有多差,我們說說專業團隊都是怎么操作環氧地坪漆施工的吧!

In fact, the problems caused by improper construction are very strange. The most common problem is that the drying and solidification can not be done for a long time. Simply speaking, any manufacturer, whether it is making high-grade epoxy paint or low-end paint, absolutely does not allow materials to be solidified, otherwise the goods will not be sold. Existence? So, in order to avoid many unnecessary losses, it is very important to find a professional team during construction. Now let's not talk about how bad the pheasant team is. Let's talk about how the professional team operates the floor paint construction.

一、施工前必須全面檢測施工現場

1. The construction site must be fully inspected before construction.

檢測現場的目的在于驗證施工場所是否達到了環氧地坪漆施工的條件,還有就是查找存在的隱患問題,通常包括但不限于以下方面:

The purpose of the inspection site is to verify whether the construction site has met the requirements of floor paint construction, and to find out the hidden problems, which usually include but are not limited to the following aspects:

1、混凝土基是否達到預期強度;

1. Whether the concrete foundation achieves the expected strength or not;

2、混凝土表面含水量是否低于8%;

2. Whether the surface water content of concrete is less than 8%.

3、基面是否有松散脫基情況;

3. Whether the base surface is loosely decomposed or not;

4、是否存在滲水漏水情況;

4. Whether there is leakage or not;

5、環境是否達到環氧漆固化的基本條件。

5. Whether the environment meets the basic conditions of curing epoxy paint.

二、施工前基面的初步處理

Preliminary treatment of foundation before construction

在以上檢測達標之后,開始施工前必須對基面進行全面的清理,目的是避免表面不良對環氧漆膜附著引起風險,通常應該注意幾種情況:

After the above tests have met the standards, the base surface must be cleaned up before construction. The purpose is to avoid the risk caused by poor surface on the adhesion of epoxy paint film. Usually, several situations should be paid attention to.

1、油污,必須用去油劑進行清洗;

1. Oil contamination must be cleaned with degreasing agent.

2、酸堿殘留,針對性選擇去酸堿清潔劑清洗;

2. Remains of acid and alkali should be cleaned with acid and alkali removal detergent.

3、附著物,如香口膠、膠紙或粘性固體等粘著物;

3. Adhesives, such as gum, adhesive paper or sticky solids;

4、水泥剝離層,混凝土的起砂層等。

4. Cement peeling layer, concrete sand layer, etc.

三、正確地調配環氧涂料

3. Correctly dispensing epoxy coatings

這一步驟是“野雞”們最容易出問題的環節,因為他們不懂得正確調配材料的重要性和具體方法,而任自以為是的操作,往往帶來了后面許多許多的問題:

This step is the most problematic step for "pheasants" because they do not understand the importance and specific methods of the correct allocation of materials, and the self-righteous operation often brings many problems behind them:

1、正確的調配比例,不同廠家調配比例是不同的,不同品種的材料,比例也不盡相同,因此在調配之前,必須先參考廠家提供的調配比例,而不是任經驗進行;

1. Correct allocation proportion, different manufacturers allocation proportion is different, different varieties of materials, the proportion is also different, so before allocation, we must first refer to the allocation proportion provided by manufacturers, rather than any experience.

2、不添加多余助劑,溶劑型環氧地坪漆需要多種助劑,但是新型的環保無溶劑型環氧漆不需要,也不可以添加多余助劑,添加的后果就是無法固化;

2. Solvent-based floor paint needs many kinds of additives without adding extra additives, but new environmentally friendly solvent-free epoxy paint does not need or can not add extra additives, and the result is that it can not be cured.

3、充分的調合操作,專業油性漆是由甲組份與乙組分構成的,使用時將兩種溶液混合在一起,并進行充分的攪拌,使其完全均勻混合才能達到良好的固化效果,如果混合不均,將引起施工后長時間無法固化的情況,這與涂料的品質沒有關系,完全是操作問題,建議使用電動攪拌器進行3分鐘以上的攪拌。

3. Full blending operation. Professional paint is composed of component A and component B. When used, the two solutions are mixed together and stirred sufficiently to achieve good curing effect. If the mixing is not uniform, it will cause a long time after construction, which is not curable with the paint. The quality has nothing to do with it. It is totally an operation problem. It is recommended to use electric agitator to mix for more than 3 minutes.

四、正確地使用環氧涂料

IV. Correct Use of Epoxy Coatings

環氧涂料調配完成之后,在施工的時候需要根據材料的特性進行正確的操作,如果操作不當,也會引發許多問題:

After the epoxy coating is prepared, the proper operation should be carried out according to the characteristics of the material during the construction. If the operation is not proper, many problems will arise.

1、凝膠完成之前用完材料,涂料調配之后開始進入固化反應狀態,在調料之后的1小時內用完材料,可以保證材料有足夠良好的流動性,隨著時間延長,漆液將越來越粘,直到固化,所以,調配材料應該以用多少調多少的原則進行,不可提前調配;

1. Before the gel is finished, the material is used up, and the paint is started to enter the curing reaction state after the dispensing. After 1 hours of dressing, the material can be guaranteed to have enough fluidity. As time goes on, the paint will stick more and more until it is solidified, so the blending material should be adjusted according to the amount of adjustment. Yes, it can't be deployed in advance.

2、正確施工材料,薄涂型漆種以輥涂為主,漆膜不可過厚,過厚容易產生固化失均性的褶皺;自流平型漆種以批刮為主,漆膜不可過薄,過薄會產生大量的氣泡,導致最后成膜之后有許多氣孔、起泡或環形丘的情況;

2. Correct construction materials, thin-coated paints are mainly roll-coated, the film should not be too thick, and it is easy to produce curing uneven folds; self-leveling paints are mainly batch scraping, the film should not be too thin, too thin will produce a large number of bubbles, resulting in a lot of pores, bubbles or annular hills after the final film formation;

3、正確的施工間隔,每道漆需經過足夠的表面固化時間間隔,待漆膜完全干燥之后才能進行下一道漆的施工,未干燥即進行搶施,最容易引起漆膜起皺和脫皮風險。

3. Correct construction interval, each paint needs enough surface curing time interval, until the film is completely dried before the next paint construction, not drying is rushed to apply, which is most likely to cause the risk of wrinkling and peeling of the paint film.

五、足夠的施工防護與完工后防護

5. Adequate Construction Protection and Post-completion Protection

無論是施工的過程中,還是施工完成之后的固化過程中,環氧地坪漆和施工操作人員,都是需要有足夠的保護措施的。首先,要保護無錫環氧地坪施工人員的生命和健康安全,對于某些有風險的操作,要有足夠的自我保護意識;其次,對于地坪項目,要保證它在投入使用之前,不因為外界原因造成不良,保護措施相當重要。

Whether in the process of construction or in the curing process after completion of construction, epoxy floor paint and construction operators need adequate protection measures. First of all, to protect the life and health of construction personnel, for some risky operations, we should have sufficient self-protection awareness; secondly, for the floor project, we should ensure that it is not harmful for external reasons before putting into use, and protection measures are very important.

本站網址:http://www.ozosggur.cn


來源:中亞地金  瀏覽次數:141
相關閱讀:環氧地坪漆在低溫下的地坪施工技巧分享 | 揭秘環氧地坪報價高低取決于哪些因素? | 無錫環氧地坪施工前需做好基面處理是必須的
 
無錫環氧地坪
  版權所有:無錫北田共建筑裝飾工程有限公司主要經營無錫環氧地坪  聯系地址:無錫市惠山區洛社鎮洛神路2號  聯系人:肖經理  電 話:0510-60865167 手 機:13306173817
傳 真:0510-60865167  郵 箱:[email protected]  網 址:http://www.ozosggur.cn  蘇ICP備12011117號  博客 網站地圖 sitemap 無錫網站建設:易商科技
燕赵风采排列七开奖统果